Camden Farm Development
Early 2014
The flagship farm of the Camden Group has been undergoing development since the windstorm of September 2013. There has been removal of the surviving shelter belts on one side of the farm to make way for a new pivot. This replace two rotorainers.
Remaining shelter belts have been cut back to safeguard against future windstorms while still providing shelter.
A new stock water lined has been installed along with new trough - there are now two troughs per paddock instead of one. A dosatron will feed minerals into this system.
You can see photos of the developments on our Facebook page. |